Redevelopment of smart road is established in sathuvacheri, Vellore under Vellore Smart City Limited. It is carried in 3 phases.
Pavement Type : Flexible Pavement
Total Length : 19.59 Kms
Project Cost : 166 Crore
Redevelopment of smart road is established in sathuvacheri, Vellore under Vellore Smart City Limited. It is carried in 3 phases.
Pavement Type : Flexible Pavement
Total Length : 19.59 Kms
Project Cost : 166 Crore
Smart roads works are carried out under Tirunelveli Smart City Limited in Tirunelveli Town & Palayamkottai.
Total Length : 21.31 Km
Type of Road : BT – 8.50 Km CC – 12.81 Km
Project Cost : 120.87 Crore
The proposed work is carried under Madurai Smart City Limited. The project includes design of pedestrian Pathways, underground ducting, Landscaping etc.
Pavement Type : Flexible Pavement
Total Length : 3.41 Kms
Parking : TW–18, Car – 29, Auto - 46
Project Cost : 47.92 Crore
Providing a road divider and widening of road in different locations in Tirunelveli is carried out under Tirunelveli Smart City Limited.
Pavement type : Flexible Pavement
Width : 3 m
Project Cost : 13.45 Crore
Streetscaping along with pedestrian work is carried out at different locations in Tiruchirappalli under Tiruchirappalli Smart City Limited.
Pavement Type : Flexible Pavement
Project Cost : 10 Crore
Upgradation of Highway roads is carried under Madurai Smart City Limited within limits of Madurai Corporation.
Total Length : 87 Kms
Project Cost : 277.17 Crore
Construction of foot over bridge in 2 locations in Chennai is carried under Chennai Metropolitan development authority (CMDA)
FOB Length : 12.81 Kms
Project Cost : 20 Crore
Foot Over bridge is established at S.N High Road carried under Tirunelveli Smart City Limited
FOB Length : 21 m
Width : 3 m
Project Cost : 14.95 Crore
Designing and Detailing of Bridge in Thrikkakara has been carried under Thrikkakara Municipality.
Project Cost : 2.50 Crore